It’s been a full 18 months since we finished Phase 1 of our Kitchen Renovation (Raising our Upper Cabinets, Adding a Backslash and Purchasing new appliances)
We’re really digging the updates love the updates we’ve made, and are finally ready to make a few more changes after living in the space a little longer. There’s so much value in living in a space before making big changes. We’ve updated our plan for Phase 2 and it’s something I never would’ve thought of before being home for so long.
Phase 2 Ideas:
– Rearrange some of our uppers and add open shelves next to our sink.
– Hire an Electrician to move a 120 volt behind the range.
– Update paneling on the Peninsula
– Paint the Cabinets
– Update Cabinet Hardware
Approximate Cost for Phase 2: $1,770
Open Shelves: ~$300
(6) Metal Shelf Brackets – $230
High Quality Lumber – TBD on species – ~$50-70
Electrician: ~$250
Paint Materials: ~$200
Cabinet Hardware: ~520
(7) Mission Bin Pull – $17/ each
(5) 6″ Large Mission Drawer Pull – $40/ each
(17) Hexagon Cabinet Knob – $11/ each
Update Lighting: ~$500
4 LED Can Light: ~$100
Glass Globe Flush Mount (Nickle Mount) – Pottery Barn: $199
Mobile Chandelier – Small – West Elm: $199
28 in White Cape May Ceiling Medallion – Home Depot: $49.97
Decor
This is 100% putting the cart before the horse, but looking at Decor pieces helps me ease into the final vision for it all.
Inspiration
Sometimes a few images still make it hard to see the whole vision. Here’s a few accounts I’m pulling inspiration from.