Which of the following is considered a major process flow structure?ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?

Lead Time

Fabrication

Lean Manufacturing

Project

2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?

Certification is sought by any firm assuming they pay annual dues.

2nd Party where a customer audits its supplier

3rd Party where a qualified national or international standards/certifying agency serves as an auditor

1st Party where a firm audits itself against ISO standards

3.Which of the following is ISO 14000 primarily concerned with?

Quality management

Time management

Continuous improvement management

Environmental management

4. Which is the one correct value stream principle?

Look for efficiencies in the factory, office, physical, procedural, and technical operations.

Eliminate waste that stops, slows down, or diverts the value stream.

Concentrate on speeding up value-adding operations rather than removing waste.

Keep the value stream moving at minimum velocity.

5. What is the starting point in developing a capacity plan for a health care operation?

Determining the effective capacity over time

Estimating design capacity

Forecasting patient demand for a reasonable length of time

Discovery of the bottleneck operation

6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?

MRP (Material Requirements Plan)

ERP (Enterprise Resource Planning)

MPS (Master Production Schedule)

WBS (Work Breakdown Structure)

7.Which of the following is an element that addresses elimination of waste under lean production?

Kanban production control system

Production ahead of demand

Minimized run times

Group plant loading technology

8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?

Level elements

Future elements

Past elements

Cyclical elements

9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:

Reducing product quality during the assembly process

Designing products so they can be manufactured by a virtual factory

Reducing equipment in the production process


 

PLACE THIS ORDER OR A SIMILAR ORDER WITH NURSING HOMEWORK HELP TODAY AND GET AN AMAZING DISCOUNT


For orders inquiries       +1 (408) 800 3377

Open chat
1
You can now contact our live agent via Whatsapp! via +1 518 291-4128

Feel free to ask questions, clarifications or discounts available when placing your order.