Bee Logistics Handle Breakbulk Shipment for Factory Construction

Bee Logistics are pleased to share their recent handling of a breakbulk shipment involving construction and factory equipment for a new industrial site in Vietnam.

The cargo involved in this shipment included a large steam boiler as well as a crane and steel structure. The total volume of the two larger units, as well as 75 smaller packages, came to 2,230 cubic meters and a weight of 399 tons.

The boiler itself featured a length of 31 meters, a diameter of 3.2 meters and an individual unit weight of 81 tons.

Thanks to the diligence of the Bee Logistics team, this delivery was completed successfully and safely on-time.

Please click here to view the full article on our official website.

www.beelogistics.com

Leave a Reply

Your email address will not be published. Required fields are marked *